The project "Construction and Operation of Street Lighting Networks in the City of Atyrau" with a total length of 148,525 m is the fourth phase of JSC Batys Transit's programme for the construction of street lighting networks in the city of Atyrau. The project uses the public-private partnership mechanism and envisages the introduction of an Automated Outdoor Lighting Management System with dimming capability.

Project goals and objectives

Goal 1
Goal 2
Goal 3
Goal 4
Goal 5

Development impact

4.6 bn
total project costs
5 ths
poles installed
5 ths
LED luminaires installed
75 control cabinets
installed
0.4 kV
170,000 metres of overhead line installation
10 kV
5,000 metres of cable line installation
20 substations
installed